How long does a full apartment renovation take in Dubai?
We're planning a full apartment renovation in Downtown Dubai — kitchen, both bathrooms, and new flooring throughout. We want to move in by September. Is 3 months enough time to complete a full apartment renovation in Dubai?
1 Answer
10 May 2026
A full apartment renovation (kitchen, 2 bathrooms, and new flooring throughout) in Dubai typically takes 8–14 weeks from start to finish — so 3 months is tight but achievable if you move fast on decisions and contractor selection. Here's a realistic timeline: Weeks 1–2: Design finalisation, material selection, and contractor quotes. This is where most projects stall — indecision on tiles, worktops, and fixtures adds weeks. Have all materials chosen before work starts. Week 2–3: Building management NOC application (allow 1–2 weeks for approval). Week 3–4: Demolition and rough work (bathroom strip-out, kitchen strip-out, floor preparation). Weeks 4–10: Main works — bathroom tiling and fitting, kitchen installation, electrical and plumbing adjustments, flooring installation. Weeks 10–12: Snagging, painting, fixtures, and fit-out completion. For a September move-in, you need a contractor signed and materials ordered by mid-June at the latest. The biggest risks to your timeline: material lead times (custom kitchen cabinets take 4–6 weeks to manufacture), building management NOC delays, and the Ramadan period if it falls within your timeline (some teams work reduced hours). Get your building management NOC application in immediately — it's the one thing you can't rush once it's submitted.
— BidMyJob Advice Team | support@bidmyjob.ae